Commercial generator installation and connection for a meat production premises in Edmonton, providing off-grid power where tying the site into the grid was too expensive.
TMC Meat needed a practical way to power its meat and doner products operation at Unit 1, 20 Kynoch Road in Edmonton. Tying the site into the grid was too expensive, so Wire Now installed an enclosed Cummins generator package to give the business an independent off-grid power source. The project focused on creating a usable electrical supply around the realities of a working food-production site: generator positioning, cable routing, connection works and the practical installation details needed for commercial operations. Instead of waiting on an uneconomic grid connection route, the business could move forward with an off-grid generator installation sized around its operational needs. Projects like this are common where commercial premises need power quickly, where a grid connection quote is uneconomic, or where a temporary-to-permanent power strategy is needed before wider electrical works. Wire Now can review the site load, compare generator, battery and grid-connection options, then deliver the electrical installation around the route that makes commercial sense.
Off-grid generator route selected after grid tie-in cost review
View case study →
View case study →
Working on a tender or PQQ?
Download our pre-qualification pack and accreditations.
Already have drawings or photos?
Upload them with your quote request for a faster response.
Let's discuss your requirements and deliver a solution that works.