Grid Constraint Audit
A desktop review for businesses that have received a DNO upgrade quote, export limit or connection refusal.
- DNO quote review
- Connection capacity triage
- Solar and battery next steps
Battery storage, export limitation and electrical-led design for businesses facing DNO upgrade quotes, connection refusals, zero-export solar conditions or constrained grid connections.
For commercial decision-makers who need electrical risk, uptime and compliance managed with clear evidence.
A DNO upgrade quote has made solar look unviable
The site has received a connection refusal or export cap
Zero-export solar needs a robust control strategy
PV generation and site load do not naturally line up
Battery storage needs to be sized against real constraints
A PPA provider needs a credible grid and savings case
Scope can be tailored by site, portfolio, access constraints and the level of reporting required.
Grid Constraint Audit for DNO quotes and refusals
Import and export capacity review
Zero-export and constrained-export solar strategy
Battery storage sizing for commercial load profiles
Solar PV concept sizing from 100kWp to 2MWp
DNO application and G99 route recommendations
Controls, metering and export limitation scope
ROI and payback assumptions for feasibility packs
PPA-ready evidence for mid-market commercial sites
A desktop review for businesses that have received a DNO upgrade quote, export limit or connection refusal.
A controlled solar PV concept for sites that can use generation on site but cannot export to the grid.
A battery-backed solar model for sites where storage can unlock savings or avoid reinforcement cost.
A fixed desktop review creates a low-friction route for sites with a DNO quote, export cap or connection refusal.
Audit outputs are desktop findings, not a final design. Final proposals depend on site survey, structural review, DNO acceptance, equipment availability and agreed commercial model.
The aim is to turn a grid constraint into a decision-ready route: proceed, redesign, stage the project or stop before more budget is spent.
DNO quote or refusal summary
Known import and export constraints
Likely solar PV size band
Battery storage role and indicative capacity range
Zero-export or constrained-export controls required
Next-step recommendation with commercial risks
Wire Now supports commercial premises across the London, Hertfordshire and Essex corridor, including North London, Greater London and surrounding areas.
Share the site, portfolio or maintenance scope and Wire Now will recommend the right route.